Triple

T20974777
Position Surface form Disambiguated ID Type / Status
Subject Willcox, Arizona E516595 entity
Predicate stateRoute P1864 FINISHED
Object Arizona State Route 191 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arizona State Route 191 | Statement: [Willcox, Arizona, stateRoute, Arizona State Route 191]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Arizona State Route 191
Context triple: [Willcox, Arizona, stateRoute, Arizona State Route 191]
  • A. Arizona State Route 179
    Arizona State Route 179 is a scenic highway in central Arizona known for connecting Interstate 17 to Sedona through striking red rock landscapes and popular tourist areas.
  • B. Arizona State Route 188
    Arizona State Route 188 is a scenic north–south highway in central Arizona that connects the Globe–Miami area to the Roosevelt Lake region and nearby rural communities.
  • C. Arizona State Route 186
    Arizona State Route 186 is a state highway in southeastern Arizona that connects the city of Willcox to the Chiricahua National Monument and surrounding rural areas.
  • D. Arizona State Route 390
    Arizona State Route 390 is a short, lesser-known state highway in Arizona that serves local traffic and connects rural areas to the broader state route network.
  • E. Arizona State Route 69
    Arizona State Route 69 is a primary state highway in central Arizona that connects Interstate 17 near Cordes Junction to the Prescott area, serving as a key route to the Prescott Valley region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Arizona State Route 191
Target entity description: Arizona State Route 191 is a north–south state highway in eastern Arizona that runs from near the Mexican border through several rural communities to the Utah state line.
  • A. Arizona State Route 179
    Arizona State Route 179 is a scenic highway in central Arizona known for connecting Interstate 17 to Sedona through striking red rock landscapes and popular tourist areas.
  • B. Arizona State Route 188
    Arizona State Route 188 is a scenic north–south highway in central Arizona that connects the Globe–Miami area to the Roosevelt Lake region and nearby rural communities.
  • C. Arizona State Route 186
    Arizona State Route 186 is a state highway in southeastern Arizona that connects the city of Willcox to the Chiricahua National Monument and surrounding rural areas.
  • D. Arizona State Route 390
    Arizona State Route 390 is a short, lesser-known state highway in Arizona that serves local traffic and connects rural areas to the broader state route network.
  • E. Arizona State Route 69
    Arizona State Route 69 is a primary state highway in central Arizona that connects Interstate 17 near Cordes Junction to the Prescott area, serving as a key route to the Prescott Valley region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4fee5ac8190875fa9ceba1a5e5e completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fba307d88190b728544d1b6d0bb6 completed April 21, 2026, 4:22 a.m.
Created at: April 16, 2026, 1:46 p.m.