Triple

T20974395
Position Surface form Disambiguated ID Type / Status
Subject STS-79 E516585 entity
Predicate nextMission P36269 FINISHED
Object STS-80 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-80 | Statement: [STS-79, nextMission, STS-80]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-80
Context triple: [STS-79, nextMission, STS-80]
  • A. STS-80 chosen
    STS-80 was a 1996 Space Shuttle Columbia mission focused on deploying and retrieving scientific satellites and conducting microgravity research in Earth orbit.
  • B. STS-86
    STS-86 was a 1997 NASA Space Shuttle mission that conducted a docking with the Russian Mir space station as part of the Shuttle–Mir program.
  • C. STS-83
    STS-83 was a 1997 NASA Space Shuttle Columbia mission focused on microgravity science research as part of the Microgravity Science Laboratory program.
  • D. STS-84
    STS-84 was a 1997 NASA Space Shuttle mission that carried Atlantis to the Russian Mir space station for crew transfer, resupply, and scientific research.
  • E. STS-87
    STS-87 was a 1997 NASA Space Shuttle Columbia mission focused on microgravity and solar physics experiments, notable for including astronaut Kalpana Chawla among its crew.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4fee5ac8190875fa9ceba1a5e5e completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fba307d88190b728544d1b6d0bb6 completed April 21, 2026, 4:22 a.m.
Created at: April 16, 2026, 1:46 p.m.