Triple
T20962201
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Krishna River Management Board |
E516275
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river management board |
C11425
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river management board Context triple: [Krishna River Management Board, instanceOf, river management board]
-
A.
water management agency
A water management agency is an organization responsible for planning, regulating, and overseeing the sustainable allocation, use, and protection of water resources within a defined region.
-
B.
river basin organization
chosen
A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
-
C.
water management structure
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
-
D.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
E.
river basin management plan
A river basin management plan is a strategic framework that outlines coordinated actions, policies, and measures to sustainably manage water resources, ecosystems, land use, and human activities within a defined river basin.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4fde6c48190af1398e7e734629e |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 1:31 p.m.