Triple
T20948522
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Devecser |
E515914
|
entity |
| Predicate | hasNearbyIndustrialFacility |
P20649
|
FINISHED |
| Object | Ajka alumina plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ajka alumina plant | Statement: [Devecser, hasNearbyIndustrialFacility, Ajka alumina plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ajka alumina plant Context triple: [Devecser, hasNearbyIndustrialFacility, Ajka alumina plant]
-
A.
Rio Tinto aluminum smelter
The Rio Tinto aluminum smelter is a large industrial facility in Kitimat, British Columbia, that processes alumina into primary aluminum for global markets.
-
B.
Alro Slatina aluminum plant
Alro Slatina aluminum plant is one of Romania’s largest industrial facilities and a major aluminum producer in Eastern Europe.
-
C.
Sohar Aluminium smelter
The Sohar Aluminium smelter is a major industrial facility in Oman that produces primary aluminium and serves as a key driver of the country’s industrial and economic development.
-
D.
Luilu Metallurgical Plant
Luilu Metallurgical Plant is a major copper and cobalt processing facility in the Democratic Republic of Congo, integral to the region’s mining and refining operations.
-
E.
Gus-Khrustalny Crystal Plant
The Gus-Khrustalny Crystal Plant is a historic Russian glassworks renowned for its high-quality crystal production and significant role in the country’s decorative arts industry.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Ajka alumina plant Target entity description: The Ajka alumina plant is a major Hungarian industrial facility known for producing alumina from bauxite and for its role in the 2010 red sludge environmental disaster.
-
A.
Rio Tinto aluminum smelter
The Rio Tinto aluminum smelter is a large industrial facility in Kitimat, British Columbia, that processes alumina into primary aluminum for global markets.
-
B.
Alro Slatina aluminum plant
Alro Slatina aluminum plant is one of Romania’s largest industrial facilities and a major aluminum producer in Eastern Europe.
-
C.
Sohar Aluminium smelter
The Sohar Aluminium smelter is a major industrial facility in Oman that produces primary aluminium and serves as a key driver of the country’s industrial and economic development.
-
D.
Luilu Metallurgical Plant
Luilu Metallurgical Plant is a major copper and cobalt processing facility in the Democratic Republic of Congo, integral to the region’s mining and refining operations.
-
E.
Gus-Khrustalny Crystal Plant
The Gus-Khrustalny Crystal Plant is a historic Russian glassworks renowned for its high-quality crystal production and significant role in the country’s decorative arts industry.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4fcd678819087a304291f14330a |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6fadab7708190bb3a10bdd3f32d90 |
completed | April 21, 2026, 4:19 a.m. |
Created at: April 16, 2026, 1:10 p.m.