Triple
T20948402
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rockwell X-24C |
E515911
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | proposed X-plane |
C6078
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: proposed X-plane Context triple: [Rockwell X-24C, instanceOf, proposed X-plane]
-
A.
X-plane
chosen
An X-plane is an experimental aircraft designed to test and demonstrate new aviation technologies, configurations, or performance capabilities beyond those of conventional aircraft.
-
B.
unbuilt aircraft project
An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
-
C.
experimental aircraft
An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
-
D.
experimental aircraft program series
A coordinated sequence of research and development efforts focused on designing, building, testing, and evaluating prototype aircraft to explore new aerospace technologies, performance capabilities, and operational concepts.
-
E.
blended wing body aircraft
A blended wing body aircraft is a fixed-wing air vehicle whose wings and fuselage form a continuous, integrated lifting surface to improve aerodynamic efficiency, fuel economy, and internal volume.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4fcd678819087a304291f14330a |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 1 p.m.