Triple
T2094519
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grand Central Madison |
E32748
|
entity |
| Predicate | builtAsPartOf |
P35910
|
FINISHED |
| Object | East Side Access project |
E234821
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: East Side Access project | Statement: [Grand Central Madison, builtAsPartOf, East Side Access project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: East Side Access project Context triple: [Grand Central Madison, builtAsPartOf, East Side Access project]
-
A.
East Side Access
chosen
East Side Access is a major New York City rail infrastructure project that brings Long Island Rail Road service into a new terminal beneath Grand Central Terminal in Manhattan.
-
B.
MTA Bridges and Tunnels network
The MTA Bridges and Tunnels network is a system of major toll bridges and tunnels in New York City operated by the Metropolitan Transportation Authority, connecting the city’s boroughs and surrounding regions.
-
C.
Second Avenue Subway
The Second Avenue Subway is a New York City Subway line on Manhattan’s East Side, built to relieve congestion on the Lexington Avenue Line and long envisioned as a major north–south transit corridor.
-
D.
Port Authority Trans-Hudson
Port Authority Trans-Hudson (PATH) is a rapid transit rail system linking Manhattan with nearby cities in New Jersey within the New York metropolitan area.
-
E.
Moynihan Train Hall
Moynihan Train Hall is a modern expansion of New York City's Penn Station, serving as a major rail hub with an airy, light-filled concourse built within the historic James A. Farley Building.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: builtAsPartOf Context triple: [Grand Central Madison, builtAsPartOf, East Side Access project]
-
A.
builtFrom
Indicates that one entity is constructed, composed, or formed using another entity as its material, component, or source.
-
B.
usedInPartOf
Indicates that something is utilized or plays a functional role within a specific component or subpart of a larger whole.
-
C.
adoptedAsPartOf
Indicates that one entity has been taken in, integrated, or accepted as a component or member within another entity or larger whole.
-
D.
usedToBePartOf
Indicates that an entity was formerly a component or member of another entity but is no longer part of it.
-
E.
builtOn
Indicates that one entity is constructed, developed, or established using another entity as its base, foundation, or underlying platform.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885eba0708190999696a45cbec816 |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69abba99ddc48190bb2097b56efb7aca |
completed | March 7, 2026, 5:41 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae5189bc088190b142dde85cad6676 |
completed | March 9, 2026, 4:50 a.m. |
| PD | Predicate disambiguation | batch_69abb7b6274081909df36cd7a7c6a675 |
completed | March 7, 2026, 5:29 a.m. |
| PDg | Predicate description generation | batch_69abba2e65b48190bb19cfc4b0f8c462 |
completed | March 7, 2026, 5:39 a.m. |
Created at: March 4, 2026, 7:43 p.m.