Triple
T20944240
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lipno Reservoir |
E515802
|
entity |
| Predicate | isAlsoKnownAs |
P39
|
FINISHED |
| Object | Lipno Dam |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lipno Dam | Statement: [Lipno Reservoir, isAlsoKnownAs, Lipno Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Lipno Dam Context triple: [Lipno Reservoir, isAlsoKnownAs, Lipno Dam]
-
A.
Niedzica Dam
Niedzica Dam is a large hydroelectric and flood-control dam on the Dunajec River in southern Poland, known for forming the scenic Czorsztyn Lake and serving as a major regional tourist attraction.
-
B.
Lipno Reservoir
chosen
Lipno Reservoir is the largest artificial lake in the Czech Republic, created for hydroelectric power generation, flood control, and recreation in the Šumava region.
-
C.
Rożnów Dam
Rożnów Dam is a hydroelectric and flood-control dam on the Dunajec River in southern Poland, forming the artificial Rożnów Lake.
-
D.
Koronowo Dam
Koronowo Dam is a hydroelectric and flood-control dam in northern Poland that creates the Koronowo Reservoir on the Brda River.
-
E.
Pilchowice Dam
Pilchowice Dam is a historic early 20th-century masonry gravity dam in southwestern Poland, notable for its large reservoir and role in regional flood control and hydroelectric power generation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4fc13408190b06868df03c5c29b |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6fad705e481909da0098d7c73cd02 |
completed | April 21, 2026, 4:19 a.m. |
Created at: April 16, 2026, 12:52 p.m.