Triple
T20934309
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Freeway Park |
E515543
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | park built over freeway |
C43935
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: park built over freeway Context triple: [Freeway Park, instanceOf, park built over freeway]
-
A.
former road bypass
A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
-
B.
urban bridge
An urban bridge is a man-made elevated structure that spans physical obstacles within a city, such as roads, railways, or waterways, to support the safe and efficient movement of vehicles, pedestrians, and utilities.
-
C.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
D.
parkway
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
-
E.
ropeway
A ropeway is an aerial transport system in which carriers such as cabins or chairs are suspended from and moved by one or more overhead cables between fixed terminals.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4fc13408190b06868df03c5c29b |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 12:49 p.m.