Triple

T2092868
Position Surface form Disambiguated ID Type / Status
Subject STS-135 E32708 entity
Predicate issExpeditionInteraction P24306 FINISHED
Object Expedition 28
Expedition 28 was a long-duration crewed mission to the International Space Station in 2011, overseeing scientific research and station operations during the final flights of the Space Shuttle program.
E232917 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Expedition 28 | Statement: [STS-135, issExpeditionInteraction, Expedition 28]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Expedition 28
Context triple: [STS-135, issExpeditionInteraction, Expedition 28]
  • A. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • B. STS-82
    STS-82 was NASA’s second Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, enhancing its scientific capabilities.
  • C. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • D. STS-88
    STS-88 was the first Space Shuttle mission to the International Space Station, delivering and assembling its initial U.S. and Russian modules in orbit.
  • E. STS-60
    STS-60 was a 1994 NASA Space Shuttle Discovery mission notable as the first joint U.S.–Russian crewed spaceflight, carrying Russian cosmonaut Sergei Krikalev.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Expedition 28
Triple: [STS-135, issExpeditionInteraction, Expedition 28]
Generated description
Expedition 28 was a long-duration crewed mission to the International Space Station in 2011, overseeing scientific research and station operations during the final flights of the Space Shuttle program.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Expedition 28
Target entity description: Expedition 28 was a long-duration crewed mission to the International Space Station in 2011, overseeing scientific research and station operations during the final flights of the Space Shuttle program.
  • A. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • B. STS-82
    STS-82 was NASA’s second Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, enhancing its scientific capabilities.
  • C. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • D. STS-88
    STS-88 was the first Space Shuttle mission to the International Space Station, delivering and assembling its initial U.S. and Russian modules in orbit.
  • E. STS-60
    STS-60 was a 1994 NASA Space Shuttle Discovery mission notable as the first joint U.S.–Russian crewed spaceflight, carrying Russian cosmonaut Sergei Krikalev.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: issExpeditionInteraction
Context triple: [STS-135, issExpeditionInteraction, Expedition 28]
  • A. hasNotableExpedition
    Indicates that an entity is associated with a significant or noteworthy expedition, journey, or exploratory mission.
  • B. expeditionObjective
    Indicates the primary goal or purpose that an expedition is intended to achieve.
  • C. roleInExpedition chosen
    Indicates the specific function, duty, or position an entity holds within the context of a particular expedition.
  • D. typicalExpeditionMode
    Indicates the usual or most common mode or method by which an expedition is conducted.
  • E. hasFirstUndisputedSurfaceArrivalExpedition
    Indicates that an expedition is recognized as the first uncontested mission to successfully arrive at and reach the surface of a specified celestial body or location.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885eba0708190999696a45cbec816 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69abba774ca881909f83cf65ffeb24bb completed March 7, 2026, 5:41 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae2748f09c81908d471b02a185ec1e completed March 9, 2026, 1:50 a.m.
NEDg Description generation batch_69ae27e4a6f88190a6af44f2cc822f31 completed March 9, 2026, 1:52 a.m.
NED2 Entity disambiguation (via description) batch_69ae2876710c81909451744f48337998 completed March 9, 2026, 1:55 a.m.
PD Predicate disambiguation batch_69abb7b6274081909df36cd7a7c6a675 completed March 7, 2026, 5:29 a.m.
Created at: March 4, 2026, 7:43 p.m.