Triple

T2092864
Position Surface form Disambiguated ID Type / Status
Subject STS-135 E32708 entity
Predicate precededByMission P25144 FINISHED
Object STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
E232915 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-134 | Statement: [STS-135, precededByMission, STS-134]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-134
Context triple: [STS-135, precededByMission, STS-134]
  • A. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • B. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • C. STS-125
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • D. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • E. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-134
Triple: [STS-135, precededByMission, STS-134]
Generated description
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-134
Target entity description: STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
  • A. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • B. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • C. STS-125
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • D. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • E. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: precededByMission
Context triple: [STS-135, precededByMission, STS-134]
  • A. wasPrecededBy chosen
    Indicates that one event, state, or entity occurred or existed earlier in time than another.
  • B. pilotLaterMission
    Indicates that an entity serves as the pilot of a mission that occurs after a referenced or earlier mission.
  • C. previousMissionOfOrbiter
    Indicates that one mission is the immediately preceding mission undertaken by a given orbiter.
  • D. firstMission
    Indicates that an entity is undertaking or associated with its initial mission or assignment in a given context.
  • E. commanderLaterMission
    Indicates that one entity served as the commander of the other entity in a subsequent mission or operation occurring later in time.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885eba0708190999696a45cbec816 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69abba774ca881909f83cf65ffeb24bb completed March 7, 2026, 5:41 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae2748f09c81908d471b02a185ec1e completed March 9, 2026, 1:50 a.m.
NEDg Description generation batch_69ae27e4a6f88190a6af44f2cc822f31 completed March 9, 2026, 1:52 a.m.
NED2 Entity disambiguation (via description) batch_69ae2876710c81909451744f48337998 completed March 9, 2026, 1:55 a.m.
PD Predicate disambiguation batch_69abb7b6274081909df36cd7a7c6a675 completed March 7, 2026, 5:29 a.m.
Created at: March 4, 2026, 7:43 p.m.