Triple

T20927685
Position Surface form Disambiguated ID Type / Status
Subject IEC Central Office E515387 entity
Predicate reportsTo P258 FINISHED
Object IEC Conformity Assessment Board NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IEC Conformity Assessment Board | Statement: [IEC Central Office, reportsTo, IEC Conformity Assessment Board]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: IEC Conformity Assessment Board
Context triple: [IEC Central Office, reportsTo, IEC Conformity Assessment Board]
  • A. IEC Conformity Assessment Board chosen
    The IEC Conformity Assessment Board is the body within the International Electrotechnical Commission responsible for overseeing and coordinating global conformity assessment systems for electrotechnical standards.
  • B. IEC
    IEC is the commonly used acronym for South Africa’s Independent Electoral Commission, the national body responsible for managing and overseeing democratic elections in the country.
  • C. IEC
    IEC is the acronym for the Institut d’Estudis Catalans, the official academic institution responsible for research and standardization of the Catalan language and culture.
  • D. IEC Standardization Management Board
    The IEC Standardization Management Board is the governing body within the International Electrotechnical Commission responsible for overseeing and coordinating its global electrotechnical standardization activities.
  • E. IEC Market Strategy Board
    The IEC Market Strategy Board is a high-level advisory group within the International Electrotechnical Commission that identifies and analyzes global technology and market trends to guide the IEC’s standardization and conformity assessment work.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4fb431c8190b9d40e6a72f0cc87 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6f652c3188190ace50415b3b30b83 completed April 21, 2026, 4 a.m.
Created at: April 16, 2026, 12:49 p.m.