Triple

T20919205
Position Surface form Disambiguated ID Type / Status
Subject Larji Dam E515154 entity
Predicate locatedNearHighway P385 FINISHED
Object National Highway 21 (old numbering) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Highway 21 (old numbering) | Statement: [Larji Dam, locatedNearHighway, National Highway 21 (old numbering)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Highway 21 (old numbering)
Context triple: [Larji Dam, locatedNearHighway, National Highway 21 (old numbering)]
  • A. National Highway 2 (old numbering)
    National Highway 2 (old numbering) was a major Indian roadway that formed part of the historic Grand Trunk Road, connecting Delhi to Kolkata across several northern and eastern states.
  • B. National Highway 19
    National Highway 19 is a major Indian roadway that forms part of the key east–west transport corridor connecting important cities across northern and eastern India.
  • C. National Highway 1 (old numbering)
    National Highway 1 (old numbering) was a major Indian national highway in the former state of Jammu and Kashmir that connected Srinagar with other key northern regions before being renumbered.
  • D. National Highway 20
    National Highway 20 was the former national route designation for a major Australian highway corridor later incorporated into the Sturt Highway.
  • E. National Highway 27
    National Highway 27 is a major Indian roadway that forms part of the country’s east–west transport corridor, linking key cities and facilitating regional connectivity and trade.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: National Highway 21 (old numbering)
Target entity description: National Highway 21 (old numbering) was a major Indian roadway in Himachal Pradesh that connected key towns in the Kullu Valley and provided access to popular Himalayan destinations.
  • A. National Highway 2 (old numbering)
    National Highway 2 (old numbering) was a major Indian roadway that formed part of the historic Grand Trunk Road, connecting Delhi to Kolkata across several northern and eastern states.
  • B. National Highway 19
    National Highway 19 is a major Indian roadway that forms part of the key east–west transport corridor connecting important cities across northern and eastern India.
  • C. National Highway 1 (old numbering)
    National Highway 1 (old numbering) was a major Indian national highway in the former state of Jammu and Kashmir that connected Srinagar with other key northern regions before being renumbered.
  • D. National Highway 20
    National Highway 20 was the former national route designation for a major Australian highway corridor later incorporated into the Sturt Highway.
  • E. National Highway 27
    National Highway 27 is a major Indian roadway that forms part of the country’s east–west transport corridor, linking key cities and facilitating regional connectivity and trade.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f9d5ec8190bb2bd27350ed341c completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6ec66593c819091ecf0c553e0aead completed April 21, 2026, 3:17 a.m.
Created at: April 16, 2026, 12:48 p.m.