Triple
T20919183
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Larji Dam |
E515154
|
entity |
| Predicate | hasHydroelectricPlant |
P15311
|
FINISHED |
| Object | Larji Hydroelectric Power Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Larji Hydroelectric Power Station | Statement: [Larji Dam, hasHydroelectricPlant, Larji Hydroelectric Power Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Larji Hydroelectric Power Station Context triple: [Larji Dam, hasHydroelectricPlant, Larji Hydroelectric Power Station]
-
A.
Rjukan Hydroelectric Power Station
Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
-
B.
Kotmale Hydroelectric Power Station
Kotmale Hydroelectric Power Station is a major Sri Lankan hydroelectric facility that harnesses the waters of the Mahaweli River to generate electricity as part of the country's largest river basin development scheme.
-
C.
Er'tan Hydropower Station
Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
-
D.
Sima Hydroelectric Power Station
The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
-
E.
Nisramont Hydroelectric Power Station
Nisramont Hydroelectric Power Station is a hydroelectric facility in Belgium that generates renewable electricity using water impounded by the Nisramont Dam on the Ourthe River.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Larji Hydroelectric Power Station Target entity description: Larji Hydroelectric Power Station is a run-of-the-river hydroelectric facility in Himachal Pradesh, India, that generates electricity using water from the Beas River.
-
A.
Rjukan Hydroelectric Power Station
Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
-
B.
Kotmale Hydroelectric Power Station
Kotmale Hydroelectric Power Station is a major Sri Lankan hydroelectric facility that harnesses the waters of the Mahaweli River to generate electricity as part of the country's largest river basin development scheme.
-
C.
Er'tan Hydropower Station
Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
-
D.
Sima Hydroelectric Power Station
The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
-
E.
Nisramont Hydroelectric Power Station
Nisramont Hydroelectric Power Station is a hydroelectric facility in Belgium that generates renewable electricity using water impounded by the Nisramont Dam on the Ourthe River.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4f9d5ec8190bb2bd27350ed341c |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6ec66593c819091ecf0c553e0aead |
completed | April 21, 2026, 3:17 a.m. |
Created at: April 16, 2026, 12:48 p.m.