Triple

T20919182
Position Surface form Disambiguated ID Type / Status
Subject Larji Dam E515154 entity
Predicate partOf P40 FINISHED
Object Larji Hydroelectric Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Larji Hydroelectric Project | Statement: [Larji Dam, partOf, Larji Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Larji Hydroelectric Project
Context triple: [Larji Dam, partOf, Larji Hydroelectric Project]
  • A. Shanan Hydroelectric Project
    The Shanan Hydroelectric Project is a historic hydroelectric power plant in Himachal Pradesh, India, that harnesses the waters of the Uhl River to generate electricity.
  • B. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • C. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • D. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • E. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Larji Hydroelectric Project
Target entity description: The Larji Hydroelectric Project is a hydroelectric power generation scheme in Himachal Pradesh, India, that utilizes the Beas River to produce electricity through dam-based water storage and release.
  • A. Shanan Hydroelectric Project
    The Shanan Hydroelectric Project is a historic hydroelectric power plant in Himachal Pradesh, India, that harnesses the waters of the Uhl River to generate electricity.
  • B. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • C. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • D. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • E. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f9d5ec8190bb2bd27350ed341c completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6ec66593c819091ecf0c553e0aead completed April 21, 2026, 3:17 a.m.
Created at: April 16, 2026, 12:48 p.m.