Triple

T20919157
Position Surface form Disambiguated ID Type / Status
Subject Jogindernagar E515153 entity
Predicate hasHydroelectricProject P15311 FINISHED
Object Shanan Power House NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shanan Power House | Statement: [Jogindernagar, hasHydroelectricProject, Shanan Power House]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Shanan Power House
Context triple: [Jogindernagar, hasHydroelectricProject, Shanan Power House]
  • A. Shanan Power House chosen
    Shanan Power House is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Holm Powerhouse
    Holm Powerhouse is a hydroelectric generating station within California’s Hetch Hetchy Power System that converts water from the Hetch Hetchy aqueduct into electricity.
  • C. Barron Gorge Hydroelectric Power Station
    Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
  • D. Denison Dam Power Plant
    Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
  • E. South Fork Powerhouse
    South Fork Powerhouse is a hydroelectric generating station that harnesses the flow of the South Fork Feather River to produce electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f9d5ec8190bb2bd27350ed341c completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6ec66593c819091ecf0c553e0aead completed April 21, 2026, 3:17 a.m.
Created at: April 16, 2026, 12:48 p.m.