Triple

T20906839
Position Surface form Disambiguated ID Type / Status
Subject East–West Corridor E514822 entity
Predicate isInPlanningOrConstruction P24929 FINISHED
Object yes LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [East–West Corridor, isInPlanningOrConstruction, yes]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isInPlanningOrConstruction
Context triple: [East–West Corridor, isInPlanningOrConstruction, yes]
  • A. hasPlanningStatus chosen
    Indicates that an entity is associated with a particular stage, condition, or outcome in a planning or approval process.
  • B. hasConstruction
    Indicates that one entity possesses, contains, or is characterized by a particular construction, structure, or built form associated with it.
  • C. hasBuildingStatus
    Indicates the current condition, classification, or operational state assigned to a building.
  • D. cityDuringConstruction
    Indicates that a city exists or is relevant during the time period in which a particular construction activity or project is taking place.
  • E. isUndergoingRedevelopment
    Indicates that an entity (such as a property, area, or facility) is currently in the process of being renovated, rebuilt, or significantly improved.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f8a1108190bce3d31331290ced completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6e900ee7881909ab1046b40dca486 completed April 21, 2026, 3:03 a.m.
PD Predicate disambiguation batch_69e5c9ac91108190a6700fcdf2f11890 completed April 20, 2026, 6:37 a.m.
Created at: April 16, 2026, 12:47 p.m.