Triple

T2090591
Position Surface form Disambiguated ID Type / Status
Subject Hogansville, Georgia E32658 entity
Predicate locatedOnCorridor P5520 FINISHED
Object Atlanta–Columbus corridor
The Atlanta–Columbus corridor is a major transportation and economic route in western Georgia that links the Atlanta metropolitan area with the city of Columbus and the communities in between.
E231181 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atlanta–Columbus corridor | Statement: [Hogansville, Georgia, locatedOnCorridor, Atlanta–Columbus corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atlanta–Columbus corridor
Context triple: [Hogansville, Georgia, locatedOnCorridor, Atlanta–Columbus corridor]
  • A. Baltimore–Harrisburg corridor
    The Baltimore–Harrisburg corridor is a key Mid-Atlantic transportation and economic region linking Baltimore, Maryland with Harrisburg, Pennsylvania.
  • B. Southeastern Highspeed
    Southeastern Highspeed is a British high-speed rail operator providing fast passenger services between London and parts of Kent and East Sussex.
  • C. Empire Corridor
    The Empire Corridor is a major passenger rail route in New York State, running from New York City through the Hudson Valley and up to cities such as Albany and Buffalo.
  • D. Jacksonville–Miami corridor
    The Jacksonville–Miami corridor is a major transportation and economic axis along Florida’s Atlantic coast, linking the metropolitan regions of Jacksonville and Miami through a continuous chain of coastal cities.
  • E. Northeast Corridor
    The Northeast Corridor is the busiest passenger rail line in the United States, running primarily Amtrak and commuter trains along the urbanized spine of the East Coast between major cities such as Washington, D.C., Philadelphia, New York City, and Boston.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Atlanta–Columbus corridor
Triple: [Hogansville, Georgia, locatedOnCorridor, Atlanta–Columbus corridor]
Generated description
The Atlanta–Columbus corridor is a major transportation and economic route in western Georgia that links the Atlanta metropolitan area with the city of Columbus and the communities in between.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Atlanta–Columbus corridor
Target entity description: The Atlanta–Columbus corridor is a major transportation and economic route in western Georgia that links the Atlanta metropolitan area with the city of Columbus and the communities in between.
  • A. Baltimore–Harrisburg corridor
    The Baltimore–Harrisburg corridor is a key Mid-Atlantic transportation and economic region linking Baltimore, Maryland with Harrisburg, Pennsylvania.
  • B. Southeastern Highspeed
    Southeastern Highspeed is a British high-speed rail operator providing fast passenger services between London and parts of Kent and East Sussex.
  • C. Empire Corridor
    The Empire Corridor is a major passenger rail route in New York State, running from New York City through the Hudson Valley and up to cities such as Albany and Buffalo.
  • D. Jacksonville–Miami corridor
    The Jacksonville–Miami corridor is a major transportation and economic axis along Florida’s Atlantic coast, linking the metropolitan regions of Jacksonville and Miami through a continuous chain of coastal cities.
  • E. Northeast Corridor
    The Northeast Corridor is the busiest passenger rail line in the United States, running primarily Amtrak and commuter trains along the urbanized spine of the East Coast between major cities such as Washington, D.C., Philadelphia, New York City, and Boston.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: locatedOnCorridor
Context triple: [Hogansville, Georgia, locatedOnCorridor, Atlanta–Columbus corridor]
  • A. hasCorridor chosen
    Indicates that one entity includes, is connected by, or provides access through a corridor to another entity.
  • B. locatedAlong
    Indicates that one entity is situated adjacent to, or running beside, the length or course of another linear feature (such as a road, river, or railway).
  • C. locatedIn
    Indicates that one entity exists or is situated within the spatial, administrative, or conceptual boundaries of another entity.
  • D. corridorOrientation
    Indicates the directional alignment or bearing of a corridor relative to a reference frame or coordinate system.
  • E. corridorType
    Indicates the specific kind or classification of a corridor associated with an entity or location.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885eba0708190999696a45cbec816 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69abba7443448190a2642769d0b5fb93 completed March 7, 2026, 5:41 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae2744d8108190b551a970956914c4 completed March 9, 2026, 1:49 a.m.
NEDg Description generation batch_69ae27c0cc40819093dcbcb34e12ada2 completed March 9, 2026, 1:52 a.m.
NED2 Entity disambiguation (via description) batch_69ae2819ec2481908652e9165d1a6636 completed March 9, 2026, 1:53 a.m.
PD Predicate disambiguation batch_69abb7b4356881909217c42ccb8bb1ed completed March 7, 2026, 5:29 a.m.
Created at: March 4, 2026, 7:43 p.m.