Triple

T20898447
Position Surface form Disambiguated ID Type / Status
Subject Mississippi Grind E514604 entity
Predicate productionCompany P490 FINISHED
Object Electric City Entertainment NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Electric City Entertainment | Statement: [Mississippi Grind, productionCompany, Electric City Entertainment]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Electric City Entertainment
Context triple: [Mississippi Grind, productionCompany, Electric City Entertainment]
  • A. Electric City Entertainment chosen
    Electric City Entertainment is a film production company known for producing feature films such as the action-thriller "The Accountant."
  • B. Crystal City Entertainment
    Crystal City Entertainment is a film and television production company involved in developing and producing screen content.
  • C. Electric City
    Electric City is a nickname for Peterborough, Ontario, reflecting its early and prominent use of hydroelectric power and electric streetlights.
  • D. Electric City
    Electric City is a nickname for Scranton, Pennsylvania, reflecting its early adoption of electric streetcars and status as a pioneering electrified city in the United States.
  • E. Electric City
    Electric City is the nickname of Anderson, South Carolina, reflecting its early adoption of electricity and historic role in hydroelectric power development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f7ebe48190952a85547a0f31a1 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6e8f826788190b11008cc94b2a4e4 completed April 21, 2026, 3:03 a.m.
Created at: April 16, 2026, 12:47 p.m.