Triple

T20886692
Position Surface form Disambiguated ID Type / Status
Subject Bishoftu E514299 entity
Predicate connectedBy P37 FINISHED
Object Addis Ababa–Adama Expressway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Addis Ababa–Adama Expressway | Statement: [Bishoftu, connectedBy, Addis Ababa–Adama Expressway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Addis Ababa–Adama Expressway
Context triple: [Bishoftu, connectedBy, Addis Ababa–Adama Expressway]
  • A. Addis Ababa–Bahir Dar highway corridor
    The Addis Ababa–Bahir Dar highway corridor is a major transport route in Ethiopia that connects the capital with the northern city of Bahir Dar, facilitating regional trade and mobility.
  • B. Addis Ababa–Jimma road corridor
    The Addis Ababa–Jimma road corridor is a major highway route in Ethiopia that connects the capital Addis Ababa with the southwestern city of Jimma, serving as a key transport and trade artery through regions such as the Gurage Zone.
  • C. Ethiopian north–south trunk road
    The Ethiopian north–south trunk road is a major arterial highway that runs the length of Ethiopia, linking key towns and cities such as Wukro and serving as a primary route for national transport and trade.
  • D. Djibouti–Addis Ababa road corridor
    The Djibouti–Addis Ababa road corridor is a major international transport route linking landlocked Ethiopia to global markets via Djibouti, serving as a critical artery for regional trade and logistics in the Horn of Africa.
  • E. Nairobi Expressway
    Nairobi Expressway is a major tolled highway in Kenya that eases traffic congestion by providing a faster route between Jomo Kenyatta International Airport and central Nairobi.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Addis Ababa–Adama Expressway
Target entity description: The Addis Ababa–Adama Expressway is Ethiopia’s first toll expressway and a major modern highway linking the capital Addis Ababa with the key regional city of Adama, significantly improving transport in the central part of the country.
  • A. Addis Ababa–Bahir Dar highway corridor
    The Addis Ababa–Bahir Dar highway corridor is a major transport route in Ethiopia that connects the capital with the northern city of Bahir Dar, facilitating regional trade and mobility.
  • B. Addis Ababa–Jimma road corridor
    The Addis Ababa–Jimma road corridor is a major highway route in Ethiopia that connects the capital Addis Ababa with the southwestern city of Jimma, serving as a key transport and trade artery through regions such as the Gurage Zone.
  • C. Ethiopian north–south trunk road
    The Ethiopian north–south trunk road is a major arterial highway that runs the length of Ethiopia, linking key towns and cities such as Wukro and serving as a primary route for national transport and trade.
  • D. Djibouti–Addis Ababa road corridor
    The Djibouti–Addis Ababa road corridor is a major international transport route linking landlocked Ethiopia to global markets via Djibouti, serving as a critical artery for regional trade and logistics in the Horn of Africa.
  • E. Nairobi Expressway
    Nairobi Expressway is a major tolled highway in Kenya that eases traffic congestion by providing a faster route between Jomo Kenyatta International Airport and central Nairobi.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f733f081908a401c0b7beb0b9f completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6d058d4dc81908398f8c75e30dc77 completed April 21, 2026, 1:18 a.m.
Created at: April 16, 2026, 12:46 p.m.