Triple
T20885822
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fairview, Quezon City |
E514275
|
entity |
| Predicate | plannedTransportProject |
P99657
|
FINISHED |
| Object | MRT-7 line |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MRT-7 line | Statement: [Fairview, Quezon City, plannedTransportProject, MRT-7 line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: MRT-7 line Context triple: [Fairview, Quezon City, plannedTransportProject, MRT-7 line]
-
A.
MRT Line 7
chosen
MRT Line 7 is a rapid transit line under development in Metro Manila, Philippines, intended to connect Quezon City with the city of San Jose del Monte in Bulacan.
-
B.
Metro Line 7
Metro Line 7 is a rapid transit route in a metropolitan subway network that connects multiple key districts and serves as an interchange point with several other lines.
-
C.
MRT Line 8
MRT Line 8 is a planned rapid transit line intended to expand Manila’s Metro Rail Transit System and improve east–west connectivity across Metro Manila.
-
D.
MRT Line 6
MRT Line 6 is the inaugural mass rapid transit corridor of Dhaka, Bangladesh, forming the backbone of the city’s emerging metro rail network.
-
E.
MRT Dark Red Line
MRT Dark Red Line is a mass rapid transit route on the MRT subway system, serving as one of its primary urban rail lines.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4f733f081908a401c0b7beb0b9f |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c67c9d1c81908031eb77c124f119 |
completed | April 21, 2026, 12:36 a.m. |
Created at: April 16, 2026, 12:46 p.m.