Triple

T20872918
Position Surface form Disambiguated ID Type / Status
Subject Trans-Timor road network E513939 entity
Predicate instanceOf P0 FINISHED
Object overland route system C3822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: overland route system
Context triple: [Trans-Timor road network, instanceOf, overland route system]
  • A. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • B. overland expedition
    An overland expedition is a long-distance journey across remote or challenging terrain, typically using rugged vehicles or pack animals, focused on exploration, self-sufficiency, and adventure rather than speed or directness of route.
  • C. ancient route listing
    An ancient route listing is a documented catalog of historical travel paths, roads, or trade routes, often detailing their locations, connections, and significance in past civilizations.
  • D. road network chosen
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • E. tourist route network
    A tourist route network is an interconnected system of paths, attractions, and services designed to guide visitors efficiently and enjoyably through a region’s key points of interest.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f675cc8190b4e745225b62eb66 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:45 p.m.