Triple
T20856538
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sudbury mining camp |
E513494
|
entity |
| Predicate | contains |
P35
|
FINISHED |
| Object | Onaping Depth project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Onaping Depth project | Statement: [Sudbury mining camp, contains, Onaping Depth project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Onaping Depth project Context triple: [Sudbury mining camp, contains, Onaping Depth project]
-
A.
Buffumville Lake project
Buffumville Lake project is a U.S. Army Corps of Engineers flood control and recreation development centered on Buffumville Lake in Massachusetts.
-
B.
Yadkin Project
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
-
C.
Nolin River Lake project
The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
-
D.
Escanaba Hydroelectric Project
The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
-
E.
Orange River Project
The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Onaping Depth project Target entity description: The Onaping Depth project is a deep underground mining development in the Sudbury Basin focused on accessing and extracting high-grade nickel, copper, and precious metal ore at significant depths.
-
A.
Buffumville Lake project
Buffumville Lake project is a U.S. Army Corps of Engineers flood control and recreation development centered on Buffumville Lake in Massachusetts.
-
B.
Yadkin Project
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
-
C.
Nolin River Lake project
The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
-
D.
Escanaba Hydroelectric Project
The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
-
E.
Orange River Project
The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4f5b01081909452f654d2fc3f50 |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c3a93ea881909b9f80a9bd0605b6 |
completed | April 21, 2026, 12:24 a.m. |
Created at: April 16, 2026, 12:44 p.m.