Triple

T20856538
Position Surface form Disambiguated ID Type / Status
Subject Sudbury mining camp E513494 entity
Predicate contains P35 FINISHED
Object Onaping Depth project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Onaping Depth project | Statement: [Sudbury mining camp, contains, Onaping Depth project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Onaping Depth project
Context triple: [Sudbury mining camp, contains, Onaping Depth project]
  • A. Buffumville Lake project
    Buffumville Lake project is a U.S. Army Corps of Engineers flood control and recreation development centered on Buffumville Lake in Massachusetts.
  • B. Yadkin Project
    The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
  • C. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • D. Escanaba Hydroelectric Project
    The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
  • E. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Onaping Depth project
Target entity description: The Onaping Depth project is a deep underground mining development in the Sudbury Basin focused on accessing and extracting high-grade nickel, copper, and precious metal ore at significant depths.
  • A. Buffumville Lake project
    Buffumville Lake project is a U.S. Army Corps of Engineers flood control and recreation development centered on Buffumville Lake in Massachusetts.
  • B. Yadkin Project
    The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
  • C. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • D. Escanaba Hydroelectric Project
    The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
  • E. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f5b01081909452f654d2fc3f50 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c3a93ea881909b9f80a9bd0605b6 completed April 21, 2026, 12:24 a.m.
Created at: April 16, 2026, 12:44 p.m.