Triple

T20841955
Position Surface form Disambiguated ID Type / Status
Subject Gordon Brown government E513122 entity
Predicate inOfficeDuring P16852 FINISHED
Object 2008 G20 Washington summit NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2008 G20 Washington summit | Statement: [Gordon Brown government, inOfficeDuring, 2008 G20 Washington summit]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 2008 G20 Washington summit
Context triple: [Gordon Brown government, inOfficeDuring, 2008 G20 Washington summit]
  • A. 2009 G20 London summit
    The 2009 G20 London summit was a major international meeting of world leaders held during the global financial crisis to coordinate economic stimulus, financial regulation reforms, and measures to stabilize the global economy.
  • B. G20 Toronto summit
    The G20 Toronto summit was a 2010 meeting of leaders from the world’s major economies focused on global financial stability and economic recovery, held in downtown Toronto amid significant security and public protests.
  • C. G20
    The G20 is an international forum of major advanced and emerging economies that meets to coordinate global economic policy, financial stability, and sustainable development.
  • D. Veintimilla summit
    Veintimilla summit is a prominent secondary peak on Ecuador’s Chimborazo volcano, often used as an intermediate or alternative high point for climbers.
  • E. Madrid Summit
    The Madrid Summit was a 1997 NATO meeting in Spain where key decisions were made on alliance enlargement and relations with partner countries, including Ukraine.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: 2008 G20 Washington summit
Target entity description: The 2008 G20 Washington summit was an emergency gathering of leaders from major world economies convened in November 2008 to coordinate a global response to the escalating international financial crisis.
  • A. 2009 G20 London summit
    The 2009 G20 London summit was a major international meeting of world leaders held during the global financial crisis to coordinate economic stimulus, financial regulation reforms, and measures to stabilize the global economy.
  • B. G20 Toronto summit
    The G20 Toronto summit was a 2010 meeting of leaders from the world’s major economies focused on global financial stability and economic recovery, held in downtown Toronto amid significant security and public protests.
  • C. G20
    The G20 is an international forum of major advanced and emerging economies that meets to coordinate global economic policy, financial stability, and sustainable development.
  • D. Veintimilla summit
    Veintimilla summit is a prominent secondary peak on Ecuador’s Chimborazo volcano, often used as an intermediate or alternative high point for climbers.
  • E. Madrid Summit
    The Madrid Summit was a 1997 NATO meeting in Spain where key decisions were made on alliance enlargement and relations with partner countries, including Ukraine.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f4898081908209e58edb8f9c45 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c34be7a081909c9e98e7f7af7fde completed April 21, 2026, 12:22 a.m.
Created at: April 16, 2026, 12:43 p.m.