Triple

T20839656
Position Surface form Disambiguated ID Type / Status
Subject STS-74 E513057 entity
Predicate followedBy P78 FINISHED
Object STS-72 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-72 | Statement: [STS-74, followedBy, STS-72]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-72
Context triple: [STS-74, followedBy, STS-72]
  • A. STS-72 chosen
    STS-72 was a 1996 NASA Space Shuttle Endeavour mission focused on retrieving a Japanese space flyer unit and conducting spacewalks to test equipment for future construction of the International Space Station.
  • B. STS-71
    STS-71 was a 1995 NASA Space Shuttle mission that marked the first docking of a Space Shuttle with the Russian space station Mir, advancing U.S.–Russian space cooperation.
  • C. STS-73
    STS-73 was a 1995 Space Shuttle Columbia mission focused on microgravity research in the United States Microgravity Laboratory-2 (USML-2).
  • D. STS-79
    STS-79 was a 1996 Space Shuttle Atlantis mission notable for delivering supplies to the Russian Mir space station and returning astronaut Shannon Lucid to Earth after her long-duration stay in orbit.
  • E. STS-32
    STS-32 was a NASA Space Shuttle mission flown by Columbia in January 1990 that deployed a communications satellite and retrieved the Long Duration Exposure Facility from orbit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cf62a88190bbf92351e9e57259 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c34a60848190b33078172675f8d7 completed April 21, 2026, 12:22 a.m.
Created at: April 16, 2026, 12:42 p.m.