Triple
T2083883
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Narmada Dam project |
E45304
|
entity |
| Predicate | majorPlanningReport |
P14218
|
FINISHED |
| Object |
Narmada Water Disputes Tribunal Award
The Narmada Water Disputes Tribunal Award is a landmark legal decision that allocated the waters of the Narmada River among Indian states and set key conditions for projects like the Sardar Sarovar Dam.
|
E232331
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Narmada Water Disputes Tribunal Award | Statement: [Narmada Dam project, majorPlanningReport, Narmada Water Disputes Tribunal Award]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Narmada Water Disputes Tribunal Award Context triple: [Narmada Dam project, majorPlanningReport, Narmada Water Disputes Tribunal Award]
-
A.
Narmada Dam project
The Narmada Dam project is a large and controversial river development and hydroelectric scheme in India, widely debated for its environmental and social impacts, including displacement of local communities.
-
B.
Kesavananda Bharati v. State of Kerala
Kesavananda Bharati v. State of Kerala is a landmark 1973 Supreme Court of India judgment that established the basic structure doctrine, limiting Parliament’s power to amend the Constitution.
-
C.
Indus Waters Treaty
The Indus Waters Treaty is a 1960 water-sharing agreement between India and Pakistan, brokered by the World Bank, that allocates use of the Indus River system and establishes mechanisms for cooperation and dispute resolution.
-
D.
Sardar Sarovar Dam
Sardar Sarovar Dam is a large multipurpose concrete gravity dam on the Narmada River in western India, known for its major role in irrigation, drinking water supply, and hydroelectric power generation.
-
E.
Indira Gandhi Canal
The Indira Gandhi Canal is one of India’s longest irrigation canals, built to bring water from the Sutlej and Beas rivers to arid regions of Rajasthan, transforming parts of the Thar Desert into cultivable land.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Narmada Water Disputes Tribunal Award Triple: [Narmada Dam project, majorPlanningReport, Narmada Water Disputes Tribunal Award]
Generated description
The Narmada Water Disputes Tribunal Award is a landmark legal decision that allocated the waters of the Narmada River among Indian states and set key conditions for projects like the Sardar Sarovar Dam.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Narmada Water Disputes Tribunal Award Target entity description: The Narmada Water Disputes Tribunal Award is a landmark legal decision that allocated the waters of the Narmada River among Indian states and set key conditions for projects like the Sardar Sarovar Dam.
-
A.
Narmada Dam project
The Narmada Dam project is a large and controversial river development and hydroelectric scheme in India, widely debated for its environmental and social impacts, including displacement of local communities.
-
B.
Kesavananda Bharati v. State of Kerala
Kesavananda Bharati v. State of Kerala is a landmark 1973 Supreme Court of India judgment that established the basic structure doctrine, limiting Parliament’s power to amend the Constitution.
-
C.
Indus Waters Treaty
The Indus Waters Treaty is a 1960 water-sharing agreement between India and Pakistan, brokered by the World Bank, that allocates use of the Indus River system and establishes mechanisms for cooperation and dispute resolution.
-
D.
Sardar Sarovar Dam
Sardar Sarovar Dam is a large multipurpose concrete gravity dam on the Narmada River in western India, known for its major role in irrigation, drinking water supply, and hydroelectric power generation.
-
E.
Indira Gandhi Canal
The Indira Gandhi Canal is one of India’s longest irrigation canals, built to bring water from the Sutlej and Beas rivers to arid regions of Rajasthan, transforming parts of the Thar Desert into cultivable land.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: majorPlanningReport Context triple: [Narmada Dam project, majorPlanningReport, Narmada Water Disputes Tribunal Award]
-
A.
planningDocument
chosen
Indicates that an entity serves as or is associated with a document created for planning or outlining future actions, strategies, or activities.
-
B.
plannedDevelopment
Indicates that one entity has been designated or scheduled for future development or construction by another entity.
-
C.
majorProject
Indicates that an entity is a primary, large-scale, or most significant project associated with another entity.
-
D.
majorDocument
Indicates that a document holds primary or significant importance within a given context or collection.
-
E.
planningNation
Indicates that a nation is responsible for planning, organizing, or coordinating the referenced activity, event, or operation.
- F. None of above.
Provenance (6 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8891869c88190a02643e3bb746f59 |
completed | March 4, 2026, 7:33 p.m. |
| NER | Named-entity recognition | batch_69abba524b60819089a11957ce6dbc4b |
completed | March 7, 2026, 5:40 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae273d3f5881909fa6d935fa85c225 |
completed | March 9, 2026, 1:49 a.m. |
| NEDg | Description generation | batch_69ae2a5767388190b16c0d2ce3af647c |
completed | March 9, 2026, 2:03 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ae2b5ff1b88190a9754f0e892b6607 |
completed | March 9, 2026, 2:07 a.m. |
| PD | Predicate disambiguation | batch_69abb7b298a48190b4bdf7c9800b058d |
completed | March 7, 2026, 5:29 a.m. |
Created at: March 4, 2026, 7:41 p.m.