Triple

T2083862
Position Surface form Disambiguated ID Type / Status
Subject Narmada Dam project E45304 entity
Predicate instanceOf P0 FINISHED
Object dam project C1458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dam project
Context triple: [Narmada Dam project, instanceOf, dam project]
  • A. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • B. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • C. arch-gravity dam
    An arch-gravity dam is a concrete dam that combines the curved, arch action of an arch dam with the mass and weight-based stability of a gravity dam to resist water pressure.
  • D. water management project chosen
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • E. concrete gravity dam
    A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891869c88190a02643e3bb746f59 completed March 4, 2026, 7:33 p.m.
Created at: March 4, 2026, 7:41 p.m.