Triple
T20830266
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cello Concerto in B minor, Op. 104 |
E512808
|
entity |
| Predicate | statusInComposerOutput |
P141993
|
FINISHED |
| Object | one of Dvořák’s most celebrated works |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: one of Dvořák’s most celebrated works | Statement: [Cello Concerto in B minor, Op. 104, statusInComposerOutput, one of Dvořák’s most celebrated works]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: statusInComposerOutput Context triple: [Cello Concerto in B minor, Op. 104, statusInComposerOutput, one of Dvořák’s most celebrated works]
-
A.
compilationStatus
Indicates the current state or outcome of a compilation process for a given entity (e.g., whether it is pending, in progress, successful, or failed).
-
B.
compositionStatus
Indicates the current state or phase of completion of a composition or creative work, such as whether it is planned, in progress, revised, or finalized.
-
C.
statusIncludes
Indicates that one entity’s status set contains or encompasses the status (or statuses) of another entity.
-
D.
hasOutputStatus
Indicates that an entity is associated with a particular state or condition of its produced output.
-
E.
assemblyStatus
Indicates the current stage or condition of an item or system in its assembly process.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4ce39108190a6e8e5df4f1c8dc5 |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c32177188190ad67572cb3b5db74 |
completed | April 21, 2026, 12:21 a.m. |
| PD | Predicate disambiguation | batch_69e5c9a1f4f48190aa9fb4ef8f8aea5a |
completed | April 20, 2026, 6:37 a.m. |
| PDg | Predicate description generation | batch_69e5d53c4d6881909b4d0a716fa5ed4a |
completed | April 20, 2026, 7:26 a.m. |
Created at: April 16, 2026, 12:42 p.m.