Triple

T20827970
Position Surface form Disambiguated ID Type / Status
Subject East Coast Protective Levee system E512754 entity
Predicate instanceOf P0 FINISHED
Object flood-control levee system C17960 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: flood-control levee system
Context triple: [East Coast Protective Levee system, instanceOf, flood-control levee system]
  • A. levee system chosen
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • B. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • C. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • D. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • E. Dam
    A dam is a large engineered barrier built across a waterway to control water flow, create reservoirs, and support purposes such as water supply, flood control, irrigation, and power generation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ce39108190a6e8e5df4f1c8dc5 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:42 p.m.