Triple

T20826002
Position Surface form Disambiguated ID Type / Status
Subject North–South Corridor (Lucknow Metro) E512699 entity
Predicate isPrincipalLineOf P41814 FINISHED
Object Lucknow Metro NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lucknow Metro | Statement: [North–South Corridor (Lucknow Metro), isPrincipalLineOf, Lucknow Metro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lucknow Metro
Context triple: [North–South Corridor (Lucknow Metro), isPrincipalLineOf, Lucknow Metro]
  • A. Lucknow Metro chosen
    Lucknow Metro is a rapid transit system serving the city of Lucknow in Uttar Pradesh, India, designed to provide fast, modern urban transportation.
  • B. Noida Metro
    Noida Metro is a rapid transit system serving the city of Noida and its surrounding areas in India’s National Capital Region.
  • C. Ahmedabad Metro
    Ahmedabad Metro is a rapid transit system serving the city of Ahmedabad and its surrounding areas in the Indian state of Gujarat.
  • D. Hyderabad Metro
    Hyderabad Metro is a rapid transit system serving the city of Hyderabad, India, featuring multiple elevated corridors designed to ease urban traffic congestion and improve public transportation.
  • E. Lucknow–Kanpur Suburban Railway
    The Lucknow–Kanpur Suburban Railway is a key suburban rail corridor in Uttar Pradesh that connects the major cities of Lucknow and Kanpur, serving dense commuter traffic between them.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isPrincipalLineOf
Context triple: [North–South Corridor (Lucknow Metro), isPrincipalLineOf, Lucknow Metro]
  • A. isMajorLineOf chosen
    Indicates that one entity is a primary or principal route, branch, or component within the structure or network represented by the other entity.
  • B. isPrincipalAssociationOf
    Indicates that one entity serves as the primary or main associated counterpart of another entity within a given context or relationship.
  • C. isOldestLineOf
    Indicates that one line is the earliest or first-established among a set of related lines.
  • D. isPrincipalAdvisorTo
    Indicates that one entity serves as the main or primary advisor to another entity, providing overarching guidance or counsel.
  • E. isPrincipalRoleIn
    Indicates that an entity holds the primary or leading role in a particular context, work, or relationship.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ce39108190a6e8e5df4f1c8dc5 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c2fd8480819099930af691d97477 completed April 21, 2026, 12:21 a.m.
PD Predicate disambiguation batch_69e5c9a1f4f48190aa9fb4ef8f8aea5a completed April 20, 2026, 6:37 a.m.
Created at: April 16, 2026, 12:41 p.m.