Triple
T20812961
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | S Shuttles |
E512358
|
entity |
| Predicate | serviceArea |
P82
|
FINISHED |
| Object | Taraval corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Taraval corridor | Statement: [S Shuttles, serviceArea, Taraval corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Taraval corridor Context triple: [S Shuttles, serviceArea, Taraval corridor]
-
A.
Sikandra–Bodla corridor
The Sikandra–Bodla corridor is a key urban stretch in Agra that serves as an important transport and development axis within the city’s metropolitan area.
-
B.
Margalla Road corridor
The Margalla Road corridor is a major thoroughfare in Islamabad that runs along the base of the Margalla Hills, connecting key sectors and government areas in the city.
-
C.
Kashi Vishwanath Corridor
Kashi Vishwanath Corridor is a major redevelopment project in Varanasi that creates a spacious, direct connection between the historic Kashi Vishwanath Temple and the Ganga riverfront, improving access and amenities for pilgrims.
-
D.
Torres Maldonado Corridor
Torres Maldonado Corridor is an architectural project by Preston Scott Cohen known for its complex geometric design and innovative spatial organization.
-
E.
Via Lata
Via Lata was the ancient Roman name for the central thoroughfare in Rome now known as Via del Corso, historically one of the city’s main urban arteries.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Taraval corridor Target entity description: The Taraval corridor is a major transit and commercial stretch in San Francisco’s Sunset District, running along Taraval Street and served by Muni light rail and bus lines.
-
A.
Sikandra–Bodla corridor
The Sikandra–Bodla corridor is a key urban stretch in Agra that serves as an important transport and development axis within the city’s metropolitan area.
-
B.
Margalla Road corridor
The Margalla Road corridor is a major thoroughfare in Islamabad that runs along the base of the Margalla Hills, connecting key sectors and government areas in the city.
-
C.
Kashi Vishwanath Corridor
Kashi Vishwanath Corridor is a major redevelopment project in Varanasi that creates a spacious, direct connection between the historic Kashi Vishwanath Temple and the Ganga riverfront, improving access and amenities for pilgrims.
-
D.
Torres Maldonado Corridor
Torres Maldonado Corridor is an architectural project by Preston Scott Cohen known for its complex geometric design and innovative spatial organization.
-
E.
Via Lata
Via Lata was the ancient Roman name for the central thoroughfare in Rome now known as Via del Corso, historically one of the city’s main urban arteries.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4cd25088190b48ca9700cd24efc |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c2d415688190b66adc44d4df9bbb |
completed | April 21, 2026, 12:20 a.m. |
Created at: April 16, 2026, 12:40 p.m.