Triple

T20812941
Position Surface form Disambiguated ID Type / Status
Subject S Shuttles E512358 entity
Predicate instanceOf P0 FINISHED
Object supplemental transit service C26510 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: supplemental transit service
Context triple: [S Shuttles, instanceOf, supplemental transit service]
  • A. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • B. feeder bus service chosen
    A feeder bus service is a local transit route that connects neighborhoods or outlying areas to major transportation hubs or mainline routes, facilitating convenient transfers and extended network access.
  • C. transit service area
    A transit service area is the geographic region within which a public transportation provider offers routes, stops, and related services to riders.
  • D. fixed-route transit service
    Fixed-route transit service is a public transportation mode that operates vehicles along predetermined paths with scheduled stops and timetables, regardless of individual passenger requests.
  • E. paratransit operator
    A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cd25088190b48ca9700cd24efc completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:40 p.m.