Triple

T20812631
Position Surface form Disambiguated ID Type / Status
Subject Line 3 Eglinton (planned) E512350 entity
Predicate instanceOf P0 FINISHED
Object planned public transit project C35368 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned public transit project
Context triple: [Line 3 Eglinton (planned), instanceOf, planned public transit project]
  • A. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • B. rapid transit expansion project chosen
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • C. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cd25088190b48ca9700cd24efc completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:40 p.m.