Triple
T20805620
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hurricane and Storm Damage Risk Reduction System program |
E512145
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood risk reduction program |
C43780
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood risk reduction program Context triple: [Hurricane and Storm Damage Risk Reduction System program, instanceOf, flood risk reduction program]
-
A.
geohazards risk reduction program
A geohazards risk reduction program is a coordinated set of policies, practices, and interventions designed to identify, assess, and mitigate risks from geological hazards such as earthquakes, landslides, and volcanic eruptions to protect people, infrastructure, and the environment.
-
B.
flood control facility
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
C.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
D.
flood hazard designation
A flood hazard designation is a classification assigned to geographic areas indicating their level of risk for flooding, typically used for planning, insurance, and regulatory purposes.
-
E.
dam safety program
A dam safety program is a systematic framework of policies, procedures, inspections, monitoring, maintenance, and emergency planning designed to ensure that dams are planned, constructed, operated, and maintained to minimize the risk of failure and protect people, property, and the environment.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4cc69f481908e98751e697b9df4 |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 12:40 p.m.