Triple

T20805104
Position Surface form Disambiguated ID Type / Status
Subject Sprengidagur E512134 entity
Predicate instanceOf P0 FINISHED
Object Shrove Tuesday celebration C29815 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Shrove Tuesday celebration
Context triple: [Sprengidagur, instanceOf, Shrove Tuesday celebration]
  • A. pre-Lenten festival chosen
    A pre-Lenten festival is a celebratory period of feasting, parades, and revelry that occurs before the Christian season of Lent, often marked by costumes, music, and communal gatherings.
  • B. Carnival
    A carnival is a lively, temporary fairground event featuring rides, games, performances, food stalls, and festive attractions designed for public entertainment.
  • C. Nativity feast
    A Nativity feast is a celebratory meal or series of meals held in honor of the birth of Jesus Christ, traditionally observed around Christmas with specific religious rituals and cultural customs.
  • D. Dorian festival
    A Dorian festival is a cultural event or celebration centered around the traditions, music, and customs associated with the ancient Dorian Greek people.
  • E. Easter Triduum
    The Easter Triduum is the three-day liturgical period in the Christian calendar, from the evening of Holy Thursday through Good Friday and Holy Saturday to Easter Sunday, commemorating the passion, death, and resurrection of Jesus Christ.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cc69f481908e98751e697b9df4 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:40 p.m.