Triple

T20768483
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 31E E511162 entity
Predicate overlapsWith P1867 FINISHED
Object Kentucky Route 84 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kentucky Route 84 | Statement: [U.S. Route 31E, overlapsWith, Kentucky Route 84]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kentucky Route 84
Context triple: [U.S. Route 31E, overlapsWith, Kentucky Route 84]
  • A. Kentucky Route 84 chosen
    Kentucky Route 84 is a state highway in Kentucky that runs through central parts of the state, connecting communities such as Hodgenville and serving as a regional connector route.
  • B. Kentucky Route 88
    Kentucky Route 88 is a state highway in Kentucky that serves as an important east–west connector through rural communities, including parts of Hart County.
  • C. Kentucky Route 78
    Kentucky Route 78 is a state highway in Kentucky that serves as a regional connector route through Lincoln County and surrounding areas.
  • D. Kentucky Route 48
    Kentucky Route 48 is a state highway in Kentucky that connects the city of Bloomfield with other nearby communities and regional routes.
  • E. Kentucky Route 79
    Kentucky Route 79 is a state highway in Kentucky that runs generally north–south, connecting several communities between the Ohio River area and central parts of the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ca01148190ac018e57e0cab46f completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c24fa1b08190b09ab8fcb87b5c01 completed April 21, 2026, 12:18 a.m.
Created at: April 16, 2026, 12:36 p.m.