Triple

T20763673
Position Surface form Disambiguated ID Type / Status
Subject Ikeda Dam E511036 entity
Predicate hasPowerPlant P9904 FINISHED
Object Ikeda Dam Hydroelectric Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ikeda Dam Hydroelectric Power Station | Statement: [Ikeda Dam, hasPowerPlant, Ikeda Dam Hydroelectric Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ikeda Dam Hydroelectric Power Station
Context triple: [Ikeda Dam, hasPowerPlant, Ikeda Dam Hydroelectric Power Station]
  • A. Guri Dam
    Guri Dam is one of the world’s largest hydroelectric dams, located on the Caroní River in Venezuela and a major source of the country’s electricity.
  • B. Oahe Dam
    Oahe Dam is a large earth-fill dam on the Missouri River in South Dakota, forming Lake Oahe, one of the largest man-made reservoirs in the United States and a major source of hydroelectric power, irrigation, and flood control.
  • C. Kurobe Dam
    Kurobe Dam is a major hydroelectric dam in Japan’s Northern Alps, renowned for its impressive scale, scenic mountain setting, and status as a key sightseeing highlight along the Tateyama Kurobe Alpine Route.
  • D. Yahagi Dam
    Yahagi Dam is a major multipurpose dam in Japan used for flood control, water supply, and hydroelectric power generation.
  • E. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ikeda Dam Hydroelectric Power Station
Target entity description: Ikeda Dam Hydroelectric Power Station is a hydroelectric facility in Japan that generates electricity using water stored and released by the Ikeda Dam.
  • A. Guri Dam
    Guri Dam is one of the world’s largest hydroelectric dams, located on the Caroní River in Venezuela and a major source of the country’s electricity.
  • B. Oahe Dam
    Oahe Dam is a large earth-fill dam on the Missouri River in South Dakota, forming Lake Oahe, one of the largest man-made reservoirs in the United States and a major source of hydroelectric power, irrigation, and flood control.
  • C. Kurobe Dam
    Kurobe Dam is a major hydroelectric dam in Japan’s Northern Alps, renowned for its impressive scale, scenic mountain setting, and status as a key sightseeing highlight along the Tateyama Kurobe Alpine Route.
  • D. Yahagi Dam chosen
    Yahagi Dam is a major multipurpose dam in Japan used for flood control, water supply, and hydroelectric power generation.
  • E. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ca01148190ac018e57e0cab46f completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c24b18b8819082e61104be6f83a3 completed April 21, 2026, 12:18 a.m.
Created at: April 16, 2026, 12:35 p.m.