Triple

T20762868
Position Surface form Disambiguated ID Type / Status
Subject Highway 401 Express-Collector System E511015 entity
Predicate instanceOf P0 FINISHED
Object express-collector highway system C3821 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: express-collector highway system
Context triple: [Highway 401 Express-Collector System, instanceOf, express-collector highway system]
  • A. highway system chosen
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • B. transportation corridors collection
    A transportation corridors collection is an organized set of linear pathways—such as roads, railways, and transit routes—grouped for managing, analyzing, or planning movement across a region.
  • C. elevated expressway
    An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
  • D. highway route
    A highway route is a designated path along interconnected roads or highways, identified by a specific number or name, that guides long-distance vehicular travel between regions or destinations.
  • E. highway segment
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c909ec8190b05987f1639513f6 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:35 p.m.