Triple

T20760737
Position Surface form Disambiguated ID Type / Status
Subject Transformers: Headmasters E510968 entity
Predicate hasCharacter P2308 FINISHED
Object Wheelie NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wheelie | Statement: [Transformers: Headmasters, hasCharacter, Wheelie]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Wheelie
Context triple: [Transformers: Headmasters, hasCharacter, Wheelie]
  • A. Wheelie chosen
    Wheelie is a small, wisecracking Autobot from the Transformers franchise known for his rhyming speech and comic-relief role.
  • B. Scooter
    Scooter is the nickname of Phil Rizzuto, the Hall of Fame shortstop and longtime New York Yankees broadcaster.
  • C. Scooter
    Scooter is a masculine given name, often used as a nickname in English-speaking countries.
  • D. Scooter
    Scooter is a bespectacled, eager-to-please Muppet who often serves as the backstage gofer and stage manager for The Muppet Show.
  • E. Scooter
    "Scooter" is the informal nickname given to the Douglas A-4 Skyhawk, a compact, carrier-capable attack aircraft used extensively by the U.S. Navy and Marine Corps.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c909ec8190b05987f1639513f6 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c248701081908ae49fca933e05f6 completed April 21, 2026, 12:18 a.m.
Created at: April 16, 2026, 12:35 p.m.