Triple
T20745345
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | M70 motorway (Hungary) |
E510565
|
entity |
| Predicate | isPartOfCorridor |
P35
|
FINISHED |
| Object | Hungary–Slovenia road corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hungary–Slovenia road corridor | Statement: [M70 motorway (Hungary), isPartOfCorridor, Hungary–Slovenia road corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hungary–Slovenia road corridor Context triple: [M70 motorway (Hungary), isPartOfCorridor, Hungary–Slovenia road corridor]
-
A.
Hungary–Austria road corridor
The Hungary–Austria road corridor is a major cross-border transport route linking Hungary and Austria and facilitating regional travel and trade between the two countries.
-
B.
Ljubljana–Maribor corridor
The Ljubljana–Maribor corridor is a key Slovenian transport route linking the capital Ljubljana with the country’s second-largest city, Maribor, and forming part of an important pan-European transit axis.
-
C.
Ljubljana–Nova Gorica corridor
The Ljubljana–Nova Gorica corridor is a key Slovenian transport route linking the capital with the western border region and serving as an important connection toward Italy and the wider European road network.
-
D.
Koper–Ljubljana road corridor
The Koper–Ljubljana road corridor is a major transport route in southwestern Slovenia that connects the coastal city of Koper with the capital Ljubljana, serving as a key link between the Adriatic coast and the country’s interior.
-
E.
Zagreb–Rijeka corridor
The Zagreb–Rijeka corridor is a major Croatian transport route linking the inland capital region around Zagreb with the Adriatic port city of Rijeka, serving as a key axis for national and international traffic and trade.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Hungary–Slovenia road corridor Target entity description: The Hungary–Slovenia road corridor is a key international transport route linking Hungary and Slovenia, facilitating cross-border travel and trade between Central and Southeastern Europe.
-
A.
Hungary–Austria road corridor
The Hungary–Austria road corridor is a major cross-border transport route linking Hungary and Austria and facilitating regional travel and trade between the two countries.
-
B.
Ljubljana–Maribor corridor
The Ljubljana–Maribor corridor is a key Slovenian transport route linking the capital Ljubljana with the country’s second-largest city, Maribor, and forming part of an important pan-European transit axis.
-
C.
Ljubljana–Nova Gorica corridor
The Ljubljana–Nova Gorica corridor is a key Slovenian transport route linking the capital with the western border region and serving as an important connection toward Italy and the wider European road network.
-
D.
Koper–Ljubljana road corridor
The Koper–Ljubljana road corridor is a major transport route in southwestern Slovenia that connects the coastal city of Koper with the capital Ljubljana, serving as a key link between the Adriatic coast and the country’s interior.
-
E.
Zagreb–Rijeka corridor
The Zagreb–Rijeka corridor is a major Croatian transport route linking the inland capital region around Zagreb with the Adriatic port city of Rijeka, serving as a key axis for national and international traffic and trade.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c845e88190b4c5f3ae79291182 |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c212b744819089bc1d47a020bd61 |
completed | April 21, 2026, 12:17 a.m. |
Created at: April 16, 2026, 12:33 p.m.