Triple
T20737521
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NYC Transit Manhattan Division |
E509750
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bus operations division |
C14467
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bus operations division Context triple: [NYC Transit Manhattan Division, instanceOf, bus operations division]
-
A.
public transit operations division
chosen
The public transit operations division is responsible for planning, scheduling, managing, and overseeing the daily operation and performance of a region’s public transportation services.
-
B.
public transport maintenance division
A public transport maintenance division is an organizational unit responsible for inspecting, repairing, and servicing vehicles and infrastructure to ensure the safe, reliable, and efficient operation of a public transportation system.
-
C.
rapid transit division
A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
-
D.
bus service network
A bus service network is an interconnected system of bus routes, stops, schedules, and vehicles designed to transport passengers efficiently across a defined geographic area.
-
E.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c589c08190834fb5d86d0efa2b |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 12:32 p.m.