Triple
T20728326
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Monroe Street Dam |
E509498
|
entity |
| Predicate | owner |
P347
|
FINISHED |
| Object | Avista Utilities |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Avista Utilities | Statement: [Monroe Street Dam, owner, Avista Utilities]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Avista Utilities Context triple: [Monroe Street Dam, owner, Avista Utilities]
-
A.
Avista
chosen
Avista is an American energy company that provides electricity and natural gas services primarily in the Pacific Northwest region of the United States.
-
B.
Idaho Power Company
Idaho Power Company is a U.S. electric utility based in the Pacific Northwest, known for generating and distributing hydroelectric power along the Snake River and surrounding regions.
-
C.
Great Western Power Company
Great Western Power Company was an early 20th-century California electric utility company known for developing hydroelectric projects and infrastructure in the Sierra Nevada region.
-
D.
PacifiCorp
PacifiCorp is a major U.S. electric utility company serving customers across several Western states.
-
E.
Evergy
Evergy is a major electric utility company serving customers primarily in Kansas and Missouri.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c4cc648190b45fda6e2b20af56 |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c1e9ed708190ad8e371646630fea |
completed | April 21, 2026, 12:16 a.m. |
Created at: April 16, 2026, 12:30 p.m.