Triple

T20725006
Position Surface form Disambiguated ID Type / Status
Subject Marche-en-Famenne E509410 entity
Predicate railwayLine P848 FINISHED
Object Belgian railway line 43 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Belgian railway line 43 | Statement: [Marche-en-Famenne, railwayLine, Belgian railway line 43]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Belgian railway line 43
Context triple: [Marche-en-Famenne, railwayLine, Belgian railway line 43]
  • A. Belgian railway line 43 chosen
    Belgian railway line 43 is a railway route in Belgium that connects the cities of Liège and Marloie through the Ardennes region.
  • B. Belgian railway line 42
    Belgian railway line 42 is a railway route in eastern Belgium that connects Liège with the Luxembourg border through the Ardennes region.
  • C. Belgian railway line 44
    Belgian railway line 44 is a railway route in eastern Belgium that connects Pepinster with the town of Spa through the Ardennes region.
  • D. Belgian railway line 4
    Belgian railway line 4 is a major electrified railway route in Belgium that connects Brussels with Antwerp as part of the country’s core intercity rail network.
  • E. Belgian railway line 54
    Belgian railway line 54 is a railway route in Belgium that connects the city of Mechelen with other regional destinations as part of the national rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c4cc648190b45fda6e2b20af56 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c1e662f08190917ee043612d413e completed April 21, 2026, 12:16 a.m.
Created at: April 16, 2026, 12:29 p.m.