Triple

T20720471
Position Surface form Disambiguated ID Type / Status
Subject Howser Spires E509296 entity
Predicate notableRoute P22 FINISHED
Object Beckey–Chouinard Route NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Beckey–Chouinard Route | Statement: [Howser Spires, notableRoute, Beckey–Chouinard Route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Beckey–Chouinard Route
Context triple: [Howser Spires, notableRoute, Beckey–Chouinard Route]
  • A. Chouinard–Herbert route
    The Chouinard–Herbert route is a classic, historically significant big-wall rock climb on Sentinel Rock in Yosemite National Park, renowned for its sustained difficulty and pioneering style.
  • B. Hornbein Couloir route
    The Hornbein Couloir route is a steep, high-altitude climbing line on the north side of Mount Everest, renowned for its technical difficulty and historical significance in Himalayan mountaineering.
  • C. Norton Couloir route
    The Norton Couloir route is a high-altitude climbing line on Mount Everest’s north face, known as a challenging alternative to the standard North Col–Northeast Ridge route.
  • D. Avalanche Gulch route
    Avalanche Gulch route is the most popular and commonly used climbing route to the summit of Mount Shasta, known for its straightforward but strenuous snow and ice ascent.
  • E. Dawn Wall route
    The Dawn Wall route is an exceptionally difficult free-climbing line on El Capitan in Yosemite National Park, renowned as one of the hardest big-wall climbs in the world.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Beckey–Chouinard Route
Target entity description: The Beckey–Chouinard Route is a classic, long alpine rock climb renowned for its sustained crack and face climbing on the South Howser Tower in the Bugaboos of British Columbia, Canada.
  • A. Chouinard–Herbert route
    The Chouinard–Herbert route is a classic, historically significant big-wall rock climb on Sentinel Rock in Yosemite National Park, renowned for its sustained difficulty and pioneering style.
  • B. Hornbein Couloir route
    The Hornbein Couloir route is a steep, high-altitude climbing line on the north side of Mount Everest, renowned for its technical difficulty and historical significance in Himalayan mountaineering.
  • C. Norton Couloir route
    The Norton Couloir route is a high-altitude climbing line on Mount Everest’s north face, known as a challenging alternative to the standard North Col–Northeast Ridge route.
  • D. Avalanche Gulch route
    Avalanche Gulch route is the most popular and commonly used climbing route to the summit of Mount Shasta, known for its straightforward but strenuous snow and ice ascent.
  • E. Dawn Wall route
    The Dawn Wall route is an exceptionally difficult free-climbing line on El Capitan in Yosemite National Park, renowned as one of the hardest big-wall climbs in the world.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c4cc648190b45fda6e2b20af56 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c1d5eec08190832ffba8a90f3076 completed April 21, 2026, 12:16 a.m.
Created at: April 16, 2026, 12:26 p.m.