Triple
T20708144
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hovedbanen company |
E508958
|
entity |
| Predicate | notableWork |
P4
|
FINISHED |
| Object | Hoved Line |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hoved Line | Statement: [Hovedbanen company, notableWork, Hoved Line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hoved Line Context triple: [Hovedbanen company, notableWork, Hoved Line]
-
A.
Hoved Line
chosen
The Hoved Line is Norway’s oldest railway line, connecting Oslo with Eidsvoll and forming a key part of the country’s rail network.
-
B.
Tua Line
Tua Line is a scenic narrow-gauge railway in northeastern Portugal, known for running along the Tua River through rugged, picturesque landscapes.
-
C.
Coast Line
Coast Line was a major Southern Pacific Railroad route running along California’s Pacific coast, connecting key cities such as Los Angeles and San Francisco.
-
D.
Coast Line
Coast Line is a major Danish railway route along the Øresund coast connecting Copenhagen with Helsingør and serving as an important commuter and regional line.
-
E.
Follo Line
Follo Line is a high-speed railway line in southeastern Norway connecting Oslo with the town of Ski to improve regional and commuter rail capacity.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c40ad88190b81f77695366d328 |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c1952e888190877b79933970f7b0 |
completed | April 21, 2026, 12:15 a.m. |
Created at: April 16, 2026, 12:14 p.m.