Triple

T20707760
Position Surface form Disambiguated ID Type / Status
Subject Statens jernbanetilsyn E508949 entity
Predicate instanceOf P0 FINISHED
Object railway safety authority C34929 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway safety authority
Context triple: [Statens jernbanetilsyn, instanceOf, railway safety authority]
  • A. rail safety regulator chosen
    A rail safety regulator is an authority responsible for setting, monitoring, and enforcing safety standards and practices across railway systems to protect passengers, workers, and the public.
  • B. railway industry body
    A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
  • C. transportation safety agency
    A transportation safety agency is an organization responsible for regulating, monitoring, and enforcing safety standards across transportation systems to prevent accidents and protect the public.
  • D. railway infrastructure manager
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c40ad88190b81f77695366d328 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:14 p.m.