Triple
T20707569
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bane NOR rail network |
E508943
|
entity |
| Predicate | includesLine |
P2124
|
FINISHED |
| Object | Østfold Line |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Østfold Line | Statement: [Bane NOR rail network, includesLine, Østfold Line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Østfold Line Context triple: [Bane NOR rail network, includesLine, Østfold Line]
-
A.
Østfold Line
chosen
The Østfold Line is a major railway line in southeastern Norway that runs from Oslo through towns in the Østfold region toward the Swedish border.
-
B.
Spikkestad Line
The Spikkestad Line is a Norwegian railway line in the Oslo region that primarily serves as a commuter route connecting suburban areas to the capital.
-
C.
Drammen Line
The Drammen Line is a major Norwegian railway route connecting Oslo with the city of Drammen and serving as an important commuter and intercity corridor in the Oslo region.
-
D.
Hornbæk Line
The Hornbæk Line is a Danish coastal railway route in North Zealand that connects Helsingør with Gilleleje, serving towns along the Øresund shoreline.
-
E.
Drammen–Hønefoss line
The Drammen–Hønefoss line is a Norwegian railway section connecting Drammen and Hønefoss that forms part of the main rail route between Oslo and Bergen.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c40ad88190b81f77695366d328 |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c1952e888190877b79933970f7b0 |
completed | April 21, 2026, 12:15 a.m. |
Created at: April 16, 2026, 12:14 p.m.