Triple

T20696742
Position Surface form Disambiguated ID Type / Status
Subject S&S Space Shot E508680 entity
Predicate instanceOf P0 FINISHED
Object pneumatic drop tower C13695 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pneumatic drop tower
Context triple: [S&S Space Shot, instanceOf, pneumatic drop tower]
  • A. drop tower ride chosen
    A drop tower ride is an amusement park attraction where riders are lifted to a great height before being rapidly released to experience a high-speed free fall and sudden deceleration.
  • B. ventilation tower
    A ventilation tower is a vertical structure designed to facilitate the intake, exhaust, and circulation of air for buildings, tunnels, or underground spaces, improving air quality and temperature control.
  • C. roller coaster lift system
    A roller coaster lift system is the mechanical assembly, typically using chains, cables, or linear motors, that raises coaster trains from the station to the initial peak to provide the potential energy needed for the ride.
  • D. peel tower
    A peel tower is a small, fortified stone tower house built along the Anglo-Scottish border in the late Middle Ages, used primarily for defense and refuge during raids.
  • E. aerial lift
    An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c2b2a481909e31e9cb8f81ab55 completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 12:10 p.m.