Triple

T20689517
Position Surface form Disambiguated ID Type / Status
Subject Jungfrau Railway tunnel E508511 entity
Predicate instanceOf P0 FINISHED
Object mountain railway infrastructure C3574 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mountain railway infrastructure
Context triple: [Jungfrau Railway tunnel, instanceOf, mountain railway infrastructure]
  • A. mountain rack railway
    A mountain rack railway is a steep-gradient railway system that uses a toothed rack rail engaged by a cogwheel on the train to provide additional traction and braking on mountainous terrain.
  • B. mountain railway terminus
    A mountain railway terminus is the end station of a rail line located in a mountainous area, where trains arrive, reverse, or terminate their journeys and passengers transfer to other transport or facilities.
  • C. mountain tramway
    A mountain tramway is an aerial or cable-driven transportation system that carries passengers or goods up and down steep mountainous terrain using suspended or rail-guided cars.
  • D. incline railway
    An incline railway is a transportation system that uses cable-hauled rail cars to move passengers or goods up and down steep slopes along fixed tracks.
  • E. railway infrastructure element chosen
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c1ed408190b72dd26b1e33f8a1 completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 12:05 p.m.