Triple
T20678050
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Akhilesh Yadav |
E508213
|
entity |
| Predicate | notableWork |
P4
|
FINISHED |
| Object | Agra–Lucknow Expressway project |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Agra–Lucknow Expressway project | Statement: [Akhilesh Yadav, notableWork, Agra–Lucknow Expressway project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Agra–Lucknow Expressway project Context triple: [Akhilesh Yadav, notableWork, Agra–Lucknow Expressway project]
-
A.
Agra–Lucknow Expressway
chosen
The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
-
B.
Bundelkhand Expressway
Bundelkhand Expressway is a major access-controlled highway in India that connects the Bundelkhand region to key economic and administrative centers in Uttar Pradesh, improving regional connectivity and development.
-
C.
Purvanchal Expressway
Purvanchal Expressway is a major access-controlled expressway in northern India that enhances connectivity across eastern Uttar Pradesh, linking rural regions with key urban and economic centers.
-
D.
Delhi–Mumbai Expressway
The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
-
E.
Delhi–Meerut Expressway
The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c1164881909a3bf1e3ddb2bc32 |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e6bea354f0819094e9ee8d3adaa221 |
completed | April 21, 2026, 12:02 a.m. |
Created at: April 16, 2026, 11:44 a.m.