Triple

T20659112
Position Surface form Disambiguated ID Type / Status
Subject Tinnelva E507708 entity
Predicate hasHydropowerPlant P15311 FINISHED
Object Lilleby hydropower plant NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lilleby hydropower plant | Statement: [Tinnelva, hasHydropowerPlant, Lilleby hydropower plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lilleby hydropower plant
Context triple: [Tinnelva, hasHydropowerPlant, Lilleby hydropower plant]
  • A. Lysebotn Hydropower Station
    Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
  • B. Hønefoss hydropower plant
    Hønefoss hydropower plant is a Norwegian hydroelectric facility located at Hønefoss, where it harnesses the flow of the Begna River to generate renewable electricity.
  • C. Tonstad Hydropower Station
    Tonstad Hydropower Station is one of Norway’s largest hydroelectric power plants, known for its significant electricity production and role in the country’s renewable energy supply.
  • D. Åbjøra hydropower plant
    Åbjøra hydropower plant is a hydroelectric facility located on the Begna river in Norway, generating renewable power from the river’s water flow.
  • E. Årlifoss hydropower plant chosen
    Årlifoss hydropower plant is a Norwegian hydroelectric facility that generates renewable energy by harnessing the flow of the Tinnelva river.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4bf58c081908e52a4500e03ff83 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6b2eff7a88190be0bdea227616e02 completed April 20, 2026, 11:12 p.m.
Created at: April 16, 2026, 11:43 a.m.